Tag-Archive for » Procurement «

February 02nd, 2012 | Author:

Santa Rosa County has received and reviewed the final draft Federal Permits from the Army Corps of Engineers (ACOE). The county is set to sign the permits and has begun the procurement/deployment process for the beach accessible snorkeling reefs on the Gulf Side of Navarre Beach Park. A final federal (ACOE) permit for the two Sound Side reef sites is expected within the next month. Applications for the required Gulf side and Sound side federal permits were submitted in September of 2009. The federal permit process was expected to take 18 months but has been delayed due to the ACOE activities associated with The Deep Horizon oil spill and associated responses. State permits were granted for both sites in 2009.

The reefs specified in the permit are the Eco System piling mounted disc reefs, a patented design by Walter Marine. If contracting details can be put together within the next two weeks, the reefs could get the go ahead from the Santa Rosa County Board of County Commission (BOCC) as early as February 23rd. The installation process itself will not be long (2-3 days in the Gulf and 3-5 days for the Sound), but a suitable weather window with multiple days of calm seas is critical for the Gulf reef installation. Weather is not as critical for the installation of the Sound side reefs. Depending on the timing of receiving the federal permits for the Sound side reefs and weather conditions, the Sound side reefs may be installed earlier than the Gulf reefs. Historically, the sea state gets calmer as we get into June, but we are hopeful the weather cooperates and the reef installation can proceed as soon as possible.